Launch week offerEnds in00h00m00s

Jae-Jun Kim

Hanyang University
Country flagSouth Korea

Research Interests

ApplyKite TwinLearns as you apply

Make your next move.

Prepare your application

Review drafts before you send them.

Explore related searches

Articles (7)

Year:

2025

Year:

2025

Year:

2025

Year:

2025

Year:

2025

Year:

2025

Agile project management pursues repetitive and continuous management through an empirical process control method considering the complexity of the project. This study aimed to propose a collaborative Building Information Modeling (BIM)-based work process, focusing on construction coordination tasks among participants during the construction phase of a project. The theoretical framework chosen for this endeavor was the Scrum framework, selected after analyzing previous research to align with the specific characteristics of construction coordination. Using the Scrum framework as a foundation, the study employed the exCPM methodology to model the collaborative BIM-based construction coordination progress. To validate the model, it underwent a transformation into a Petri-Nets model through the marked graph building block (MGBB) along with established rules for model conversion. The converted model was then subjected to validation through reachability tree analysis. The findings of this study hold applicability to diverse collaboration processes that leverage BIM in the construction industry.

Year:

2024

Collaborators (2)

Ju-Hyung Kim

Professor

Hanyang University

SOUTH KOREA
View details

Seunghyeon Wang

University College London

UNITED KINGDOM
View details