Sviatoslav Vasylets
Acting Head of Department
Research Interests
Make your next move.
Prepare your application
Review drafts before you send them.
Explore related searches
Articles (7)
Year:
2026
Year:
2026
Year:
2025
The object of the study is the main dewatering system of the mine. Climate change has stimulated the refusal to use coal in many countries. In conditions of massive closure of mines, there is a need to pump out mine waters to avoid flooding. A significant water influx determines the high cost of electricity consumed by pumps. It is proposed to increase the efficiency of the mine dewatering system due to the introduction of a smart power supply grid with photovoltaic generation. The relative value of the annual balance of payment for energy consumption is chosen as an optimization parameter. The rated capacity of the photovoltaic station is optimized according to the criterion of approaching, with accuracy up to the permissible mismatch, the absolute value of the optimization parameter to zero. The relationship between the optimization parameter and the rated capacity of the photovoltaic station is represented by a parabolic regression. Regression parameters are estimated in the case study for a specific mine based on the results of a single-factor simulation experiment conducted using a computer model of a smart power grid. The randomness of natural, technical and economic factors is taken into account. Based on the prediction intervals for the regression, the optimal rated capacity of the photovoltaic station for the selected mine is estimated at 3.164 MW with a pump capacity of 1.732 MW. It was found that the annual energy savings for the case study conditions reach 3,745 MWh. Equipping the power supply grid of the main dewatering system with a photoelectric station of optimal configuration will reduce the cost of consumed electricity to several percent. This will make it possible to avoid financial costs for maintaining the balance of underground water and reduce the flooding probability of coal regions being transformed
Year:
2022
The object of the research is a measuring current transformer of the electromagnetic type, which is used as part of the electricity metering unit. The current transformers functioning in the mode of reduced primary current is accompanied by significant errors. The existence of such a regime for a long time due to downtime of production equipment leads to a significant underestimation of electricity. This leads to unjustified financial losses for energy supply companies as electricity in many countries has become more expensive. The static characteristic of the measuring current transformer at a reduced load of the metering unit is described by a linear statistical model. The parameters of the model are estimated on the basis of empirical data using methods of covariance analysis. The adequacy of the model is confirmed by analysis of regression residuals. The obtained statistical model of the static characteristic, unlike the known ones, is characterized by universality, as it describes current transformers with an arbitrary transformation ratio within the studied accuracy class of 0.5S. The uncertainty of the current error is estimated using the prediction intervals for the transformers secondary currents as a function of the primary currents, calculated on the basis of the obtained model. The prediction intervals for sample values of the current error were obtained through the application of the proposed approach for uncertainty estimation of such an error at a reduced load of the metering unit. It was found that the current error can reach −20 %. Taking into account the indicated intervals for measuring current transformers at a reduced load of the metering unit during billing will allow energy supply companies to increase the accuracy of commercial electricity metering.
Year:
2022
Year:
2022
Year:
2022
Collaborators (1)
Kateryna Vasylets
-
Make your next move.
Prepare your application
Review drafts before you send them.