Maria Vlasiou
Has grant
Research Interests
Explore related searches
Contact this professor
Get a free first email built on one of their papers, ready for you to edit and send yourself.
Recent Grants
Grant: Close
The mathematics of stochastic transport and signalling in cells
Open Date: 2021-01-01
Close Date: 2024-01-01
Grant: Close
MEMI: Measurable effects of mini-lectures on improving student engagement and outcomes
Open Date: 2020-01-01
Close Date: 2021-01-01
Grant: Close
Stochastic processes driven by non-convex resource allocation problems
Open Date: 2019-10-01
Close Date: 2023-09-01
Grant: Close
Complexity in high-tech manufacturing
Open Date: 2017-09-01
Close Date: 2021-09-01
Grant: Close
Limited resources in layered networks
Open Date: 2015-09-01
Close Date: 2019-09-01
Articles (18)
Year:
2025
Year:
2025
High-tech systems are typically produced in two stages: (1) production of components using specialized equipment and staff and (2) system assembly/integration. Component production capacity is subject to fluctuations, causing a high risk of shortages of at least one component, which results in costly delays. Companies hedge this risk by strategic investments in excess production capacity and in buffer inventories of components. To optimize these, it is crucial to characterize the relation between component shortage risk and capacity and inventory investments. We suppose that component production capacity and produce demand are normally distributed over finite time intervals, and we accordingly model the production system as a symmetric fork-join queueing network with N statistically identical queues with a common arrival process and independent service processes. Assuming a symmetric cost structure, we subsequently apply extreme value theory to gain analytic insights into this optimization problem. We derive several new results for this queueing network, notably that the scaled maximum of N steady-state queue lengths converges in distribution to a Gaussian random variable. These results translate into asymptotically optimal methods to dimension the system. Tests on a range of problems reveal that these methods typically work well for systems of moderate size. Funding: This work is part of the research program Complexity in High-Tech Manufacturing, (partly) financed by the Dutch Research Council (NWO) [Grant 438.16.121]. The research is also supported by the NWO programs MEERVOUD to M. Vlasiou [Grant 632.003.002] and Talent VICI to B. Zwart [Grant 639.033.413].
Year:
2024
Year:
2024
Year:
2024
Year:
2024
Year:
2024
Year:
2024
Year:
2023
Year:
2023
Year:
2023
Year:
2023
Year:
2023
Year:
2022
Year:
2022
Year:
2022
Year:
2021
Year:
2021
Collaborators (7)
Frits Spieksma
Professor at Eindhoven University of Technology
Eindhoven University of Technology
Alessandro Di Bucchianico
Eindhoven University of Technology
Maria Nataly Bañol Arias
University of Twente
Adelle Coster
UNSW Sydney
Mirjam Meijer
Eindhoven University of Technology
Willem van Jaarsveld
Eindhoven University of Technology
Bert Zwart
Eindhoven University of Technology
Make your next move.
Prepare your application
Review drafts before you send them.